
Australia
Australia
Arccon has been awarded a contract for the design and construction of two 90 metre tailings thickeners at the Sino Iron project at Cape Preston by China Metallurgical Group Corporation (MCC). Arccon submitted a non-conforming lump-sum bid for these thickeners which provided the client with significant cost and time savings.
Project principal:
China Metallurgical Group Corporation (MCC)
Commencement date:
November 2010
Completion date:
May 2011